Commercial roofing: systems, replacement and cost

Replacing a commercial roof without losing control of the scope

A replacement run as a project: the assembly named layer by layer, the tear off decision made on evidence, the sequence agreed before mobilization, and the building watertight every night it is open.

Request a replacement bidSee what is included

A roof stripped back to the deck and battens

What is included

The assembly named layer by layer

Deck preparation, insulation type and thickness, cover board, attachment method, membrane and thickness, and every flashing detail. Named by product, not described in a sentence.

A tear off decision with evidence behind it

Moisture survey results and core samples decide whether the old roof comes off or stays. We show you what they found before you choose.

Unit rates for the unknowns

A rate per sheet of deck and per board of wet insulation, agreed before anything opens, so finding them does not reopen the price.

A sequence, not just an end date

The order the sections come off, the daily work area, and the points where a crane, a permit or a mechanical contractor has to be booked in.

The building watertight each night

No more roof is opened than can be closed before the crew leaves, and the join between new and old work is rebuilt as a temporary water cut off every day the job runs.

A closeout package

Warranties registered in your name, the final inspection report, drawings of what was built, and photographs of every detail taken before it was covered.

How it works

  1. Survey and test the roof

    A walk of the surface and the details, then a moisture survey and cores where the decision needs them. This is where a full replacement sometimes becomes a partial one.

  2. Agree the scope in writing

    The assembly, the details, the exclusions and the unit rates. You approve this document before it becomes a price.

  3. Price, compare and contract

    The same scope priced as line items. The contract carries the specification as an attachment, the payment stages, the change order rule and the warranty terms.

  4. Plan the building around the work

    Tenant notice, parking and loading, crane windows, air intakes, equipment disconnection and the hours work may run. Agreed before materials are ordered.

  5. Build, inspect and hand over

    Section by section, photographed as it goes, with the manufacturer inspection and the punch list completed before final payment is released.

Request a replacement bid

What decides the price

Area and how cut up the roof is
The cost sits in the details rather than the open field, so a small roof covered in curbs and pipes carries more work per unit than a plain warehouse.
What has to come off
Every existing layer removed adds labor and disposal. A ballasted or gravel surfaced roof adds weight and volume before the membrane below it is even reached.
Insulation and fall
Thickness is usually set by code at replacement rather than matched to what was there, and tapered boards to build fall cost more than flat ones.
Deck condition
Unknown until the roof is open. It is the single largest reason a replacement price moves after the contract is signed, which is why it is quoted as a rate.
Rooftop equipment and details
Units, ducts, solar, screens and every penetration have to be flashed by hand, and several of them need another trade before the roofer can finish.
Access and working hours
Crane positions, lift access, permits, tenant quiet hours and night work all change how many hours the same square of roof takes.

We price the job after we know these. We do not publish a rate that ignores them, because it would be wrong for most buildings.

What the scope document settles

A replacement goes wrong in the gap between what you thought you were buying and what the crew was told to build. The scope closes that gap. It fixes the assembly, fixes the details, names the exclusions and prices the unknowns, and once you have approved it, changes to it require your signature rather than a conversation on the roof.

It also does something quieter. It makes the bids comparable. Send the same document to three contractors and a difference in price means a difference in approach, which you can act on. Send a description of the building instead and you get three different roofs at three different prices, and no way to tell which one assumed the least.

What we will not agree to

We will not recommend an overlay without knowing whether the existing insulation is dry. An overlay over wet insulation seals the water in, the decay continues where nobody can see it, and the eventual tear off takes everything anyway. The evidence for that decision costs a fraction of the roof.

We will not open more roof in a day than the crew can close before it leaves. That rule sets the pace of the whole job, and a schedule that ignores it is a schedule with water damage priced into it somewhere.

We will not price the deck as a lump sum. Anyone who does is either carrying a large contingency you are paying for or planning to come back to you once the roof is open.

When the timing works and when it does not

The best version of this project starts a year before the roof has to come off. That is enough time to survey it, test it, write a specification, compare real bids and take a slot early in the season rather than the leftovers.

The worst version starts the week a tenant reports water. There is no time to test, no time to compare and no leverage, and the roof gets replaced on someone else’s schedule at someone else’s price.

Occupied buildings change the sequence rather than the decision. Work happens above the deck, tenants stay in place, and what they need is notice: the dates, the daily hours, which section is open this week and who to call if water appears. Laboratories, kitchens, data rooms and medical suites need more than notice, because adhesive fumes and torch work sit directly above their air intakes. Raise those at the bid stage so the method reflects them.

Common questions

What has to be in the specification before anyone prices the job?

Enough detail that two contractors reading it would build the same roof, plus an exclusions list and unit rates for the unknowns.

  • Insulation type and thickness, cover board, attachment method and fastening pattern all named
  • Membrane named by product and mils, with flashing details drawn rather than summarized
  • Edge metal, drain bowls, walkway pads and terminations at every wall and curb
  • Exclusions name where deck replacement, equipment disconnection, interior repairs and permits live
  • Unit rates turn the unknowns into arithmetic rather than a negotiation on site

Write the specification before you invite prices, or have a consultant write it. A specification written after the bids is shaped by whoever bid lowest, and that scope is the one you will receive.

Can a replacement be split across two budget years?

Often, and a moisture survey is what tells you whether it is sensible.

  • One section saturated and the rest dry is the case for phasing
  • Wetness spread thinly across the roof buys two mobilizations instead of one
  • You set up twice, buy smaller quantities, and the second phase price is not fixed
  • The join between new and old needs a proper termination rather than a lap
  • Two phases can mean two warranties with different start dates and terms

Manufacturers warrant the roof they inspected, so ask what will actually be issued for each phase, and get it in writing before you commit to the split.

What happens to the rooftop units while the roof is replaced?

They are lifted, supported or disconnected so the new assembly can be flashed underneath and around them, and that work usually belongs to a mechanical contractor rather than the roofer.

  • It is the commonest reason a replacement schedule slips
  • Book the mechanical trade before tear off, not when the crew reaches the unit
  • Cooling, ventilation or process air may be down for part of a day
  • Kitchen exhaust and laboratory extract need shutdown agreements rather than notice

The curb under a rooftop unit is one of the places commercial roofs leak most, because it is hand built and sits under a machine that vibrates. Replacement is the one chance to rebuild that detail, and it is wasted if the unit never moves.

Who decides how much deck gets replaced?

You do, on the contractor's recommendation, and the mechanism should be in the contract before the first sheet comes off.

  • Nobody can price the deck in advance, so ask for a rate per unit
  • A photograph of every area called out as failed, taken before it is covered
  • A named person on your side who approves the quantity before the work happens
  • A definition of failed, since corroded steel is not surface rust on a sound sheet

Expect some deck work rather than none. Old roofs that have leaked usually have damage at drains, under ponding areas and along the perimeter, so a bid carrying no allowance is not cheaper, it is unfinished.

Will the new roof sit higher than the old one?

Usually yes. Insulation is generally brought up to current standards rather than matched to what was there, and tapered boards to correct drainage add more.

  • Flashing heights at parapets and walls must stay adequate above the new surface
  • Counterflashings, coping and door thresholds onto the roof may need reworking
  • Curbs under equipment may need extensions so flashing still turns up far enough
  • Drain bowls reset to the new level, or the roof ponds around them
  • Edge metal, scupper openings and equipment supports all follow

None of this is a problem when it is priced and drawn at the start. Ask how much the assembly will grow and what has to be adjusted, and expect the answer in the scope rather than on site.

Read more on this

  • Replacement readiness

    What to settle before a commercial roof replacement starts: the condition evidence, the system decision, the budget, the logistics and the paperwork.

  • Installation

    Commercial roof installation explained phase by phase: protection, tear off, deck repair, insulation, details, membrane, inspection and handover documents.

  • Recover or tear off

    Recover or tear off a commercial flat roof: the code limits, the moisture test, the structural check and what each path does to drainage and warranty.