Roofing Bid Comparison Checklist

Download the PDFPrint this checklist

A crew working from a suspended platform at the edge of a building

This is a checklist for comparing commercial roofing bids. It assumes you have two or three in front of you and the numbers do not line up, which is the normal situation rather than an unusual one.

The aim is not to find the lowest price. It is to find out what the differences actually are.

What each bid must state

Item Why it matters
System, named by manufacturer and product Type alone does not define what is being installed
Recover or tear off The single largest cost difference between two bids
Insulation type and thickness Invisible once installed, and easy to reduce quietly
Attachment method Governs wind performance and deck suitability
Surface preparation Governs whether anything sticks to anything else
Detail treatment Upstands, curbs, penetrations, edge metal
Drainage work Outlets, strainers, clamping rings, overflows
Deck repair rate A number per unit area, not a sentence of reassurance
Disposal Where the old roof goes and who pays
Exclusions Written down, rather than discovered later

Where the differences hide

Look at What to ask
A much lower price What is excluded that the others have included
A much higher price What is included that the others have not
Insulation thickness Whether it meets current code for this building
Preparation allowance How it is specified and how it is verified
Detail work Whether each detail type is named or covered by one line
Drainage Whether it appears at all
Equipment handling Who lifts, disconnects and reinstates rooftop plant
Phasing Whether the price assumes an empty or an occupied building

The commercial terms

Compare What to watch for
Payment schedule A deposit proportionate to materials, not to the project
Change order process How a variation is priced and who authorizes it
Retention An amount held until completion and sign off
Programme Duration, and the weather assumptions behind it
Liability during the works Who carries the risk of water entering an open roof
Lien waivers Provided as payments are made

The warranty, as its own column

Compare Why
Issuer Manufacturer, contractor, or both
Scope Material only, or material and labor
Duration And the date it runs from
Conditions What voids it, and what maintenance it requires
Transferability Whether it survives a sale, and at what cost
Who performs the required maintenance And at whose expense

The five questions for every bidder

Ask What a good answer sounds like
What preparation have you allowed? A method and a way of verifying it
How will the details be formed? Named details, not a general assurance
What is your deck repair rate? A figure per unit area
How is the roof secured each night? A described, practiced routine
Who will be on site? Named crew, directly employed or named subcontractor

What to do with it

  1. Write one scope and issue it to everybody. This is the step that makes the rest possible.
  2. Put the answers next to the prices. The differences show up in the answers.
  3. Ask the lowest bidder what is excluded. Neutrally, and expect a straight answer.
  4. Treat the warranty as a separate column. Not as part of the number.
  5. Accept a cheap bid when the reason is explainable. Cheap is not the same as thin.

Want the reasoning behind these checks? Read how to choose a contractor and what drives commercial roofing cost.

Common questions

Why are three bids so often not comparable?

Because each contractor wrote their own scope, and each one solved the problem slightly differently. One quoted a recover, one a tear off, one a coating, and the three numbers describe three different projects rather than three prices for the same piece of work on the same roof.

  • Different scopes produce different numbers for the same roof
  • Insulation thickness varies and is invisible once installed
  • Detail treatment is where the quiet savings are made
  • Drainage work is often omitted entirely by one bidder
  • Deck repair may be included, excluded or simply unmentioned

The fix is to write the scope yourself and send the same one to everybody. It takes an afternoon with a condition report, and it converts a confusing spread of numbers into a straightforward comparison. Where a bidder proposes something different, ask them to price your scope as well as theirs, so you get the comparison and their better idea at the same time.

What does the lowest bid usually leave out?

Preparation, detail work and drainage, in roughly that order. These are the items a client cannot see on completion and cannot easily check afterwards, which is precisely why they are the ones that disappear when somebody is pricing to win rather than pricing to build.

  • Surface preparation, which governs whether anything adheres
  • Detail treatment at upstands, curbs and penetrations
  • Drainage work, including strainers, clamping rings and overflows
  • Thinner insulation than the specification asks for
  • Deck repair, excluded entirely rather than priced

None of this means the lowest bid is wrong. It means the difference has to be explained before it can be accepted. Ask the lowest bidder directly what they have allowed for the items above, and ask the highest what they have included that the others have not. Both answers are usually given freely and both are informative. Put the two answers side by side and the real spread between the bids is usually much narrower than the headline numbers suggested it would be.

How should the warranty figure in the comparison?

As a separate column, not as part of the price. A longer warranty from a manufacturer whose system costs more is a different proposition from a longer warranty offered by the contractor on their own workmanship, and the two are frequently presented as though they were equivalent.

  • Manufacturer warranty and workmanship warranty are different documents
  • Material only cover is narrower than it sounds
  • Length means little without the conditions attached to it
  • Nearly all require documented maintenance somebody must perform
  • Transferability matters if the building might be sold

Ask each bidder for a specimen warranty document rather than a description of one. Comparing the actual conditions side by side usually collapses what looked like a meaningful difference, and occasionally reveals a real one. Either way it is a ten minute exercise that happens before the contract rather than during a claim. A warranty is also only as good as the company standing behind it, which is a reason to check trading history alongside the document itself.

What questions separate a good bid from a cheap one?

Questions about the things that are not visible on completion. What the preparation is, how the details are formed, what happens when the deck is found to be damaged, and what the plan is if weather arrives while the roof is open on an occupied building.

  • What preparation is allowed for, and how it is verified
  • How upstands, curbs and penetrations will be detailed
  • The stated rate for deck repair per unit area
  • How the roof is made watertight at the end of each day
  • Who will actually be on site, and whether they are directly employed

Ask the same five questions of every bidder and write the answers down next to the prices. The differences between contractors show up far more clearly in those answers than in the numbers, and the bidder who answers them specifically and without hesitation is usually the one who has done the work rather than estimated it.

Does the cheapest bid ever win on merit?

Regularly, and it is worth saying so. A smaller contractor with lower overheads, a crew already working nearby, or a genuinely better method can be both cheaper and better. The point of the comparison is to find out which kind of cheap you are looking at.

  • Lower overheads are a real and legitimate advantage
  • A crew already in the area saves mobilization cost
  • A better method can reduce both price and risk
  • A quiet period in the schedule produces keen pricing
  • An established relationship with the manufacturer can help on price

The test is whether the contractor can explain the difference. A bidder who says clearly that they are cheaper because their crew finishes a job two streets away that week has given you a reason you can check. A bidder who cannot account for the gap at all is a bidder whose number is likely to move once the work has started.

Get a quote

Three things and we will call you back. No obligation.

Or call (646) 643-3790